Open tcllib tickets

Triage of all 509 open and Pending tickets of tcllib (bugs, patches and feature requests) on 2026-11-15. Each ticket was checked against tcllib trunk on Linux with Tcl 9.1, 9.0, 8.6 and 8.5, using local servers for the network modules and a Windows 11 VM for Windows-only tickets. Outdated, superseded, duplicate and misfiled tickets are listed separately. Rows marked patch link to a prototype fix with a regression test (147 in all, in tcllib-triage/prototypes). Updated 2026-11-16.

Highlights

Since the triage (updated 2026-11-16)

9 of 509 tickets are closed or pending (None 5; Invalid 2; Out of Date 1; Fixed 1); 40 more have fix check-ins and 0 more have comments. Rows show the progress with an emoji; open a row for the details.

Triage run 2026-11-15

all 509 open and Pending tickets of tcllib: 308 bugs, 150 feature requests and 51 patches, many from the SourceForge era. They were checked in 26 batches on Linux against tcllib trunk (adeef82ca0, 2026-11-13) with Tcl 9.1, 9.0, 8.6 and 8.5. Network modules (ftp, ftpd, smtp, pop3, pop3d, dns, ldap, http, websocket, …) were tested against local servers on 127.0.0.1. A Windows 11 VM ran the Windows-only tickets and the whole test suite. 148 prototype patches were written. Every patch that changes code includes a regression test, which fails without the fix and passes with it on 9.1 and 8.6. Nothing has been committed or posted yet.

Progress (2026-11-16)

35 fix branches are on the server for 40 tickets, each with a "Proposed fix in branch" comment on its ticket. The emoji in the rows show each ticket's state. The branches are the prototypes with their regression tests. The module tests pass on Linux with Tcl 9.1, 8.6 and 8.5, and on Windows with 9.1 and 8.6, with no failure that trunk does not have too.

Verdicts

134 reproduced and 22 partly fixed. 129 feature requests are still open; many of those could be closed as stale. 22 docs issues, 22 not reproduced, 23 not a bug.

Broken on trunk or in the last release (worth fixing first)

Unmerged branches that are ready, or nearly

review and merge, or close:

Prototypes that overlap

some patches touch the same lines or each add the same new test file, so they must be merged by hand:

Behaviour changes in the prototypes

these need a decision:

Test suite problems found

Ticket housekeeping